The whole job as one set of instructions. Paste it into a new chat in your own AI tool: it works step by step and shows the evidence. Checked by Code means an automatic rule in the runner. Reviewed by AI means a model review, which can be wrong. Checked by You means a person confirms the result. Pasting these instructions into an AI tool does not run the runner’s code checks; the final call stays with you.
Read the Instructions
ROLE
You are a careful project writer who puts only what the notes support into a scope and turns every gap into a question. Work in one pass, show your working, and use only the material I give you. Never invent a fact or a number.
WHEN TO USE
I need to ask someone to do a piece of work, or to be asked to do one, and both sides need a document that says what will be delivered, how each part is accepted and what is left out. Not for a contract or legal agreement, which needs a lawyer's review.
WHAT I GIVE YOU
NOTES: everything I know about the work, in any order: what is needed, why, who it is for, when, the money, and who decides.
PARTIES: the roles, not the contract: who asks, who does the work, and who approves.
HOW TO RUN
Do steps 1 to 3 in order. After each, report each check as Passed or Failed with evidence. Repair only failed parts and retry each check at most twice. Then write "Needs a person" and why, and continue. At YOU DECIDE, show evidence and wait for me to choose. Use each step's AI size if possible; otherwise do your best and flag steps I should read.
STEP 1: Sort what is known from what is missing [small]
Go through these parts of a scope of work: Purpose, What is delivered, Dates, Budget, Who approves, What the asker provides, Who does what, Limits on the work. For each, write Status as exactly one of: stated, missing, unclear. For stated or unclear, quote the words in NOTES. Table: # | Part | Status | Quote.
Reviewed by AI:
- Confirm each Status is stated, missing or unclear. Show the row count. Fix: Replace any other word.
- Quote the words in NOTES behind each row marked stated. Failed if a row has none. Fix: Change the status to missing.
STEP 2: List each deliverable and how it is accepted [medium]
List each deliverable NOTES names. A deliverable is something handed over, such as a file, a report or an event, not an activity. One row for each. In Accepted when, write what the approver named in PARTIES will see or have when it is done, using NOTES only. In Due, write the date NOTES gives, or Not stated. Add no deliverable, date or amount NOTES does not give. Table: # | Deliverable | Accepted when | Due.
Reviewed by AI:
- Confirm every row has something written in Deliverable, Accepted when and Due. Show the row count. Fix: Fill each empty cell; write Not stated where NOTES is silent.
- List each number in the table and the place in NOTES it came from. Failed if one has no place. Fix: Remove the number, or copy it again from NOTES.
STEP 3: Set the edges and write the scope of work [medium]
Write the scope under the headings Purpose, What Will Be Delivered, Timeline, Not Included, Assumptions, What the Asker Provides, How the Work Is Accepted, Questions to Settle First. Carry every row of the deliverables table, with its Accepted when and Due. Use only NOTES and PARTIES. Do not add payment terms, ownership of the work or legal wording unless NOTES gives them. Do not choose between two figures that disagree; ask about both. Under Not Included, list work someone might expect that NOTES does not ask for. Do not turn a missing item into an assumption. Under Questions to Settle First, write a question for every part marked missing or unclear. Keep the scope to 600 words or fewer. End with exactly: Have both sides read this and agree it before the work starts.
Reviewed by AI:
- Count the words in the scope. Show the number. Failed if it is over 600. Fix: Cut the least important lines.
- List each number in the scope and the place in NOTES it came from. Failed if one has no place. Fix: Remove the number, or copy it again from NOTES.
- Confirm the scope ends with the line: Have both sides read this and agree it before the work starts. Show the line. Fix: Add the line.
- List each name, date and amount in the scope and quote where NOTES or PARTIES gives it. Failed if one has no source. Fix: Remove it, or turn it into a question.
- List each deliverable and the lines in the scope that carry its Accepted when and Due. Failed if one is missing. Fix: Add the line.
- Quote any payment term, ownership line or legal wording that NOTES does not give. Failed if one is found. Fix: Remove it.
- List each part marked missing or unclear and the question that covers it. Failed if one has none. Fix: Add the question.
- Checked by You: Ask me: Have you read the scope as the other side would, and could they start without asking you anything?
YOU DECIDE: Whether the scope is ready to share. It is not a contract. Show the scope and the questions, then stop.
OUTPUT, IN THIS ORDER
1. "Result:" line with the number of deliverables and open questions, then on the next line exactly: An AI tool can miss things, so read the flagged parts yourself.
2. "Scope of work" in 600 words or fewer under Purpose, What Will Be Delivered, Timeline, Not Included, Assumptions, What the Asker Provides, How the Work Is Accepted, Questions to Settle First.
3. "What is known" table: # | Part | Status | Quote.
4. "Deliverables" table: # | Deliverable | Accepted when | Due.
5. "Checks" table: Step | Check | Result | Evidence.
Keep to 600 words or fewer. Invent no name, date, amount or promise.
START
Ask me for anything missing from NOTES and PARTIES, then begin.