Example built from the before and after
October 17, 2026, typical sample
- Check:Every quote is word for word from the notes
Eleven events from the notes are in the timeline.
- Check:Each effect is went well or got in the way
Nine rows, each Effect one of the two allowed words: 6 got in the way and 3 went well. The finish date and the change order total are skipped as final results.
- Check:Every change has an owner and a way to know
Six rows, each with a change, an owner role and a way to know filled in.
- Check:The review ends with the reminder to check it with the people involved
The closing line is there: Check this draft with the people who were there before you share it.
- Check:Every number in the review is in the notes
Every number in the review (20, 6, 2, 3, 9 and 5) is in the notes.
- Check:No line puts the fault on a person
No line names a person or a firm as a cause or says anyone failed; the rows name roles and what the situation lacked.
- Check:Each change fits its cause and names an action
Each of the six changes answers the cause in its own row; where the cause is Not in the notes (the curtain wall, the RFI answers and the wiring crew), the change is to find out why.
- For your read:The people involved read it before it is shared
Will you ask the superintendent and the procurement lead whether the rows match what they remember, and find out why the wiring crew was short?
Fixed: Nothing needed fixing in this example: every check passed on the first pass.
Met 7 of 7, plus 1 for your read
1 check is for your read: the tool hands it to you.