Break a Project Into Steps

Turn a project description into a short list of steps with one job each, put them in an order a person can follow, say how long each takes and who does it, and check the plan against the date.

Bring: The project

Add Your Material

Illustrated Examples: the runs and scores on this page are written by hand, not recorded from a tool. How We Test

Step 1: List the Pieces the Project Needs

Write down each thing the description says must exist, be booked, be sent or be ready, with the words it uses.

Expected result: A table of the pieces the project needs, each with the description's own words.

Prepare the First Prompt

The Connected Flow

Select a part to see its prompt, input, output and check.

Add Your Material

Add your material below. Logic Lab prepares Step 1; you copy it into your own AI and check the answer there. The site does not run the workflow.

Example materialSample
Choose a sample
Choose a sample input

A small job with three pieces, a clear date, a named helper and plenty of free hours, so the plan is short and fits.

Step 1 Chat Prompt

Review the exact prompt, then paste it into your own AI. For later steps, use the chat chain in Other Formats and Files.

You are a careful assistant who reads a project description closely and writes down only what it says.

Your task is to list the pieces of work the project below needs, using the description's own words. This step does one job: it lists pieces. It does not make steps.

The project:
I need to make a one-page handout for the new volunteers. I already have the text in a document. It needs a logo at the top and a map of the building. It must be printed, 20 copies, by Friday, November 6. Priya in the front office will print it. I have about 2 hours free each day this week and next.

Rules:
- Write one row for each thing the description says must be made, booked, sent, told or ready.
- In "Piece", name it in a few words as a thing, such as "Room with a projector", not as an action.
- In "Quote", copy the words about it from the description, word for word, as short as you can. Do not reword the quote.
- If the project needs something the description never mentions, you may add up to two rows for it. Write exactly None found in the Quote cell of those rows.
- Do not split a piece into steps yet. Do not add a date, a number or a name the description does not give.

Return one markdown table and nothing else:
| # | Piece | Quote |
Copy and open ChatGPTCopies this result and opens a blank chat. Paste and review it there.

This copies step 1. The other steps follow below.

Before Step 2, check: Every quote is word for word from the description.

What This Sample Should Produce

A short sequence should add the logo and map to the supplied text, confirm the proof, then give Priya time to print 20 copies by November 6. The stated two hours a day is enough; avoid an invented dependency.

A result guide for this invented input, not an AI reply.

Fit It to Your Reader

For a guided run, choose its output and use its material labels. Format and length here apply to Copy and downloads.

The template as written. Your choices change Copy and the downloads.

Run It Step by Step
  • Who It Is For: Anyone who runs a small project, such as a coordinator, an assistant, a team lead or a volunteer organizer.
  • Time: 20 minutes

Download It

Choose a Format

  • Prompt Chain

    Copy each step into ChatGPT or Claude, one after another.

Other Formats and Files

The Step 1 chat prompt under Add Your Material is the quick start. Choose a full prompt chain, checklist, Claude skill or n8n file when that destination fits your work. Checked Instructions, below, name the checks for each step: Checked by Code, Reviewed by AI, or Checked by You.

Checked Instructions

The whole job as one set of instructions. Paste it into a new chat in your own AI tool: it works step by step and shows the evidence. Checked by Code means an automatic rule in the runner. Reviewed by AI means a model review, which can be wrong. Checked by You means a person confirms the result. Pasting these instructions into an AI tool does not run the runner’s code checks; the final call stays with you.

Read the Instructions
ROLE
You are a careful project coordinator who plans only from what the description says and never invents a person, date or number. Work in one pass, show your working, and use only the material I give you. Never invent a fact or a number.

WHEN TO USE
I know what the project is and need its steps in order, with a time and a person for each, from a rough note or a description, so I have one plan to follow without a meeting. Not for tracking a project that is already running, or plans that need budgets, risks or other teams.

WHAT I GIVE YOU
PROJECT: the project description, as it stands: what is being made, the date, who can help and how many hours there are.

HOW TO RUN
Do steps 1 to 4 in order. After each, report each check as Passed or Failed with evidence. Repair only failed parts and retry each check at most twice. Then write "Needs a person" and why, and continue. At YOU DECIDE, show evidence and wait for me to choose. Use each step's AI size if possible; otherwise do your best and flag steps I should read.

STEP 1: List the pieces the project needs [small]
List every piece of work PROJECT says must be made, booked, sent, told or ready. One row for each. In Piece, name it in a few words as a thing, such as Room with a projector. In Quote, copy the words from PROJECT that call for it, word for word, as short as you can. Add no piece PROJECT does not call for. Table: Piece | Quote.
Reviewed by AI:
- Confirm each quote appears in PROJECT exactly as written. Show the row count. Fix: Replace any reworded quote with the original words.
- Count the things PROJECT says must be made, booked, sent, told or ready, and compare with the row count. Show both numbers. Failed if they differ. Fix: Add a row for each piece left out, or remove a row PROJECT does not call for.

STEP 2: Split each piece into steps of one job [medium]
Turn each piece into steps. One row for each step, pieces in order. Each step does one job and starts with a verb. In Done when, write the sign that the step is finished. Add no step that no piece needs. Table: Piece | Step | One job | Done when.
Reviewed by AI:
- Confirm every row has something written in One job and Done when. Show the row count. Fix: Fill each empty cell, or remove a row that is not a step.
- Quote every step that asks for two things at once. Failed if one is found. Fix: Split that step into two rows.

STEP 3: Order the steps and give each a time and a person [medium]
Put the steps in an order a person can follow. For each step, write Needs first: the numbers of the steps that must finish before it starts, or none. Write Time needed as exactly one of: under an hour, half a day, a day, a few days, a week or more. Write Who as a person or role PROJECT names; if PROJECT names no one, write Not stated. Table: # | Step | Needs first | Time needed | Who.
Reviewed by AI:
- Confirm every row has something written in Needs first, even if it is none. Show the row count. Fix: Fill each empty cell.
- Confirm each Time needed is under an hour, half a day, a day, a few days or a week or more. Show the row count. Fix: Replace any other wording with the nearest allowed phrase.
- List each step and the steps in its Needs first cell, and confirm each of those has a lower number. Failed if one comes later. Fix: Move the step, or correct its Needs first cell.
- List each number in the Step column and the place in PROJECT it came from, leaving out the step numbers in the # and Needs first columns. Failed if one has no place. Fix: Remove the number, or replace it with a phrase from the allowed times.

STEP 4: Write the plan and check it against the date [medium]
Write the plan as the ordered table from the last step, then a line starting Fits the date: with yes, no or not stated, and the one reason. Judge fit only from the date and the hours PROJECT gives; if it gives none, write not stated. After that, list the questions PROJECT leaves open under Open questions. End with exactly: Check the order and the times with the people who will do the work before you start.
Reviewed by AI:
- Confirm the plan ends with the line: Check the order and the times with the people who will do the work before you start. Show the line. Fix: Add the line.
- Quote the date or the hours in PROJECT that the Fits the date line rests on. Failed if there are none and the line says yes or no. Fix: Change the line to not stated, or correct it.
- Checked by You: Ask me: Have you shown the plan to the people who will do the work, and do they agree with the order and the times?
YOU DECIDE: Whether the plan is right to follow. Show the plan and the fit line, then stop.

OUTPUT, IN THIS ORDER
1. "Result:" line with the number of steps and the Fits the date answer, then on the next line exactly: This plan comes from the checks above. An AI tool can miss things, so read the flagged parts yourself.
2. "Plan" table: # | Step | Needs first | Time needed | Who.
3. "Fits the date:" line with yes, no or not stated, and the one reason.
4. "Open questions": what the description leaves unsaid.
5. "Checks" table: Step | Check | Result | Evidence.
Keep to one page. Add no step, person, date or number the description does not give.

START
Ask me for anything missing from PROJECT, then begin.

Using a Download:How to use this in n8nHow to install a Claude skill

Watch This Template Being Built.

What You Need First

  • The project(needed)

    Paste what you know, in any order. Say what you are making, the date it must be done by, who can help and how many hours you have.

Ways to Adapt It

  • The template makes each step do one job, and each of its own steps does one job too. They list the pieces, split them, order them, add time and people, then write the plan. Run the steps one at a time if you want to change one.
  • Say the date and the hours you have in the description. The plan can only tell you whether it fits when it has both, and it says so when one is missing.
  • The times are guesses in plain words, not estimates from data. Change any that you know better, then run the last step again.
  • A number that is only in your head is not in the description, so the number check will not accept it in the plan. Write it in the description if you want it used.
  • For a big project, run it once for each part and join the tables.
  • Paste only what you are allowed to share with an AI tool. Change names to roles first if you would rather not share them.

Pick the reader, format and length above, then download it again.

The Scoring Guide

Sample

Each template check has a criterion marked met or not met; a person must still make the handed checks. (The guides in Quality rate a whole piece of work on three levels.) Under each one is how the three Illustrated Examples scored.

Download the scoring guide (Markdown)

Show the 10 checks and how each scored
  • Every quote is word for word from the description

    A plain rule

    Meets:Every quote in the table is found word for word in the description.
    Does not meet:A quote has been reworded, or is not found word for word in the description.
    Claude, Illustrated:Met
    ChatGPT, Illustrated:Met
    n8n, Illustrated:Met
  • Every step has a job and a way to see it is done

    A plain rule

    Meets:Every step has a job and a way to see it is done filled in.
    Does not meet:A step has a blank or a dash in the job or in the Done when cell.
    Claude, Illustrated:Met
    ChatGPT, Illustrated:Met
    n8n, Illustrated:Met
  • Every step says what it needs first

    A plain rule

    Meets:Every step says what it needs first, using letters, or the word Nothing.
    Does not meet:A step has a blank or a dash in the Needs first cell.
    Claude, Illustrated:Met
    ChatGPT, Illustrated:Met
    n8n, Illustrated:Met
  • Every time is one of the five allowed phrases

    A plain rule

    Meets:Every Time needed cell is one of under an hour, half a day, a day, a few days or a week or more.
    Does not meet:A cell has a number or other words, such as two weeks or soon.
    Claude, Illustrated:Met
    ChatGPT, Illustrated:Met
    n8n, Illustrated:Met
  • The plan ends with the reminder to check it with the people doing the work

    A plain rule

    Meets:The plan ends with the line Check the order and the times with the people who will do the work before you start.
    Does not meet:The line is missing or reworded.
    Claude, Illustrated:Met
    ChatGPT, Illustrated:Met
    n8n, Illustrated:Met
  • Every number in the plan is in the description

    A plain rule

    Meets:Every number in the plan is also in the description.
    Does not meet:A number is in the plan that the description does not give, such as a date or a cost.
    Claude, Illustrated:Met
    ChatGPT, Illustrated:Met
    n8n, Illustrated:Met
  • Each step does one job

    A second look by the AI

    Meets:Each step names one job, with no and, then or list inside it.
    Does not meet:A step joins two jobs, such as reserve the room and test the projector.
    Claude, Illustrated:Met
    ChatGPT, Illustrated:Met
    n8n, Illustrated:Met
  • No step comes before one it needs

    A second look by the AI

    Meets:No step comes before a step it needs, and every letter named in Needs first is a step in the table.
    Does not meet:A step comes before one it needs, or names a letter that is not in the table.
    Claude, Illustrated:Met
    ChatGPT, Illustrated:Met
    n8n, Illustrated:Met
  • The fit check says only what the description supports

    A second look by the AI

    Meets:The fit section uses only the hours and the date in the description, and says so when one is missing.
    Does not meet:The fit section says the plan fits, or does not, using hours or dates the description does not give.
    Claude, Illustrated:Met
    ChatGPT, Illustrated:Not met
    n8n, Illustrated:Met
  • The person doing the work agrees with the order and the times

    You check this one

    Meets:You read the plan with the person who will do the work and changed any step or time they disputed.
    Does not meet:The plan is used without the person doing the work reading it, or a disputed time is left in.
    Claude, Illustrated:For your read
    ChatGPT, Illustrated:For your read
    n8n, Illustrated:For your read

Claude, Illustrated: met 9 of 9, plus 1 for your read

ChatGPT, Illustrated: met 8 of 9, plus 1 for your read

n8n, Illustrated: met 9 of 9, plus 1 for your read

Learn From This Template

Each step has one job, and so does each step of this template: list the pieces, split them, put the steps in order. Because the order is its own step, a wrong order is caught there and only that step runs again.

Where to see it: step 2 (Split each piece into steps of one job); step 3 (Put the steps in order).

Read the guide: StepsTake the lesson: Steps, one job each (lesson 2)

Which One Fits?

Where This Comes From

Everything else on this page is Logic Lab's own working method. It is not taken from these sources or from any published rule.

Author
Logic Lab
Date Checked
November 8, 2026
Review Status
Checked against the sources listed. Not legal or professional advice.
Last Run
October 6, 2026: n8n, import format 2.20 (Illustrated Example)
Tools and Versions
Claude, Sonnet model; ChatGPT, GPT model; n8n, import format 2.20
What Was Checked
The files, against each tool’s import format, and 3 Illustrated Examples, each check’s finding recorded.
Version
1.0
What Changed
First release.

Report a Problem with This TemplateHow We Test