Example built from the before and after
October 17, 2026, typical sample
- Check:Every requirement is quoted word for word
Six requirements, each with what the document must show.
- Check:Every passage is quoted word for word from the document
Six rows: five source passages and one None found (the installation instructions).
- Check:Each requirement is marked covered, partly covered or not covered
Six judgments, each one of the three allowed words: 2 covered, 3 partly covered, 1 not covered.
- Check:Every gap row is filled in
Four rows under Gaps to close, each with all three cells filled.
- Check:Every requirement in the gap list is in the requirements word for word
Four quoted requirements: numbers 1, 3, 4 and 6.
- Check:The counts add up to the judgments
The Result line says 6 requirements, 2 covered, 3 partly covered and 1 not covered; the table has four rows, one for each requirement that is not fully covered.
- Check:No gap is filled with a detail nobody gave
No row states or suggests a figure, product or date; each says only what is missing and where it belongs.
- For your read:You decide which gaps matter
Does the missing U-factor matter to the architect who set the requirements, and is a sample on the way enough for the reviewer?
Fixed: Nothing needed fixing in this example: every check passed on the first pass.
Met 7 of 7, plus 1 for your read
1 check is for your read: the tool hands it to you.