Write a weekly project status report

Turn your rough notes on this week's project work into a short status report that keeps what is done, what is under way, what is blocked and what you need from the reader in separate places, using only what your notes say.

Sample results: runs and scores on this page are illustrations while testing is set up. How we test

Bring: Your notes from the week

Use This TemplatePrepare a prompt for your own AI chat.
  • Who it is for: Project coordinators, site administrators, office managers, assistants and team leaders who send a regular update to someone who was not in the room.
  • Time: 15 minutes
Open in the Editor
Other Formats and Files

The Step 1 chat prompt under Use This Template is the quick start. Choose a full prompt chain, checklist, Claude skill or n8n file when that destination fits your work. Checked Instructions, below, run the whole job with a hard check after every step.

Choose one format

  • Prompt chain

    Copy each step into ChatGPT or Claude, one after another.

Checked Instructions

The whole job as one set of instructions. Paste it into a new chat in your own AI tool: it works step by step, runs a hard check after each one, shows the evidence, and leaves the final call to you.

Read the Instructions
ROLE
You are an experienced project coordinator who writes short, plain status reports and writes down what the notes say and nothing more. Work in one pass, show your working, and use only the material I give you. Never invent a fact or a number.

WHEN TO USE
I run or support a project, I have a pile of notes, messages or log entries from the week, and my manager, client or team expects a one-page update. Not for judging whether the project is on track (the person decides that).

WHAT I GIVE YOU
WEEK NOTES: my notes, log entries or message highlights from the week, in any order, with dates where I have them. Leave out personal details about people on the project.

HOW TO RUN
Do steps 1 to 3 in order. After each step, run its checks and print one line per check: Passed or Failed, with the evidence. If a check fails, repair only the failed part, rerun that check, and try at most 2 times; then write "Needs a person" and the reason, and carry on. Where a step says YOU DECIDE, show the evidence and stop; do not choose for me. Each step names the AI size that suits it (small, medium or large). If my tool lets me switch, I will. If not, do your best and tell me which steps I should read myself.

STEP 1: List each thing the notes report [small]
List every separate update in WEEK NOTES. An update is one thing that was done, is under way, is waiting, is at risk, or needs a decision or an action from someone. Quote each update word for word, as short as you can. One row for each; merge none and add none. Table: # | Update (quote).
Checks:
- Confirm each Update appears in WEEK NOTES exactly as written. Show the row count. Fix: Replace any reworded update with the original words.

STEP 2: Sort each update by what the reader needs to know [small]
Sort every update. One row for each, quoted word for word. Status is exactly one of: done, under way, blocked, risk, needs a decision, none. Blocked means the notes say work cannot go on until something else happens. Risk means the notes say something could go wrong but has not yet. Needs a decision means someone must choose, approve or act before the work can go on. In Who Acts, write the role or person the notes name, or not stated. Do not guess, and do not decide how serious a block or a risk is. Table: # | Update (quote) | Status | Who Acts.
Checks:
- Confirm each Status is done, under way, blocked, risk, needs a decision or none. Show the row count. Fix: Replace any other word.
- Quote the words in WEEK NOTES behind each Who Acts that is not marked not stated. Failed if one has none. Fix: Change it to not stated.

STEP 3: Draft the status report [medium]
Write a one-page report under Summary, What We Need From You, Done This Week, Under Way, Blocked or at Risk, Next Week, Open Questions. Summary is two or three sentences of fact; give no overall rating such as on track unless the notes use those words. What We Need From You lists every update marked needs a decision, and every blocked item that someone outside the project can clear, each with who acts. Use only the updates in the table. Add no task, date, cost, person or reason the notes do not give. Use roles or names exactly as the notes give them. Put an update marked none under Open Questions, or under Summary if it is a plain fact. Under Next Week list only what the notes say is planned, or write: nothing is planned in the notes. Under Open Questions list what the notes do not say, such as a Who Acts marked not stated. End with exactly: Check the dates and figures against your own records before you send it.
Checks:
- List each number in the report apart from the Result line, and the place in WEEK NOTES it came from. Failed if one has no place. Fix: Remove the number, or copy it again from WEEK NOTES.
- Confirm the report ends with the line: Check the dates and figures against your own records before you send it. Show the line. Fix: Add the line.
- List each update and the heading it sits under. Failed if one is missing or sits under the wrong heading. Fix: Add the update under the right heading.
- Quote any task, date, cost, person, reason or rating in the report that WEEK NOTES does not give. Failed if one is found. Fix: Remove it.
- List each row marked needs a decision and each blocked row that someone outside the project can clear, and the line under What We Need From You that carries it. Failed if one has no line. Fix: Add the line.
- Ask me: Have you read the report as the person who receives it, checked each date, cost and name against your own records, and found each block and risk described the way you would describe it?
YOU DECIDE: Whether the report is sent, and how serious each block and risk is.

OUTPUT, IN THIS ORDER
1. "Result:" line with the number of updates in each status, then on the next line exactly: This report comes from the checks above. An AI tool can miss things, so read the flagged parts yourself.
2. The report under Summary, What We Need From You, Done This Week, Under Way, Blocked or at Risk, Next Week, Open Questions, ending with the reminder line.
3. "Updates" table: # | Update (quote) | Status | Who Acts.
4. "Checks" table: Step | Check | Result | Evidence.
Keep the report to one page. Add no task, date, cost, person or rating the notes do not give.

START
Ask me for anything missing from WEEK NOTES, then begin.

Using a download:How to use this in n8nHow to install a Claude skill

Use This Template

Add your material below. Logic Lab prepares Step 1; you copy it into your own AI and check the answer there. The site does not run the workflow.

Example materialSample
Choose a sample
Choose a sample input

Short notes with everything on track and no decision needed.

Step 1 Chat Prompt

Review the exact prompt, then paste it into your own AI. For later steps, use the chat chain in Other Formats and Files.

You are a careful project coordinator who writes down what the notes say and nothing more.

Your task is to list every separate update in the notes below.

The notes:
Week of June 2, office move. The movers were booked for June 20. All desks are labeled. We are still packing the supply room, about half done.

Rules:
- An update is one thing that was done, is under way, is waiting, is at risk, or needs a decision or an action from someone.
- Quote each update from the notes word for word, as short as you can. Do not correct it and do not reword it.
- One row for each update. Do not merge two updates and do not add one the notes do not have.

Return one markdown table and nothing else:
| # | Update (quote) |
Copy and open ChatGPTCopies this result and opens a blank chat. Paste and review it there.

This copies step 1. The other steps follow below.

Before Step 2, check: Every update is quoted word for word from your notes.

What This Sample Should Produce

Sort the labeled desks as done, the packing as under way and the booked movers as none, report nothing blocked, and say nothing is planned in the notes for next week.

A result guide for this invented input, not an AI reply.